| 3. Assemble Parts of remote control
power curtain system |
| Warning: Children should
stay away while the system is under assembly and inatallation |
|
General Information
There should be enough space for the assembly of the product.
The tools required for the installation of this product are
electrical drill with 6cm diameters drill bit, fiber measuring
tape, cross head screw driver, hand saw, a pair of pliers and
a wrench. The wrench comes with the package. |
|
|
3.1 Curtain Track Length
The length of the curtain tracks should be cut into proper length. It
is recommanded that not to cut the track that comes with the
base for the transmission box and the end base.
(1). Measure the length of the track and cut to the required
length by the hand saw.
(2). Allow space of 2 to 3 cm between the transmission box and
the wall.
(3). Make sure you measure the correct length of the track before
you cut the track into proper size.
(4).Install the transmission box only after you cut the track
into proper size. |
| |
| 3.2 Curtain Track Assembly |
(1). Undone the
wire and remove the twists from the wire. Also uncoils
the wire carefully.
(2). Loosen the big head screw on carrier "A"
to half way as shown in figure 1.
(3). Loosen the small head screw on carrier "B" to half
way as shown in figure 2. |
.
|
 |
 |
|
figure 1 Carrier A
|
figure 2 Carrier B
|
figure 3 Track with
base
|
|
(4). Loosen the fasten screw
at the end base, with the pulley system, then take the
end base out of the curtain track carefully in the direction along
the track. The wire will go along with the end base. Make
sure not to twist and coil the wire itself.Also,
do not twist the wire with the track and do not let let the pulleys drop out of the track.
See figure 3 and 4. Since there is enough length for the wire, so that
the wire will go along with the end base
(5). Connect the tracks by using the track connector. See figure 5, and
make sure each track has the same number of small pulleys.
(recommended one pulley for every 100mm long)
|
 |
 |
|
figure 4 End base
|
figure 5 Track connector
with tracks
|
|
(6). Repeat procedure 4 and 5
if more than one track are needed to be installed.
(7). Put the end base, with the pulley system, into the end
of the added window curtain track and fasted the screw on the end base.
(8). Pull the wire until it is taut and fasten the screw in
carrier "A". The screw in carrier "B" is
still half way loosens as show in figure 2.
(9) Use the wrench to turn the screw clockwise,
which is located at the end of the system to increase the taut of the wire. |
| |
3.3 Carrier Installation
(1). Move carrier "A" to the end of the track and
move carrier "B" to the other end of the track. Fasten
the screw on carrier "B".
(2). Move the small copper ring to carrier "A" and
use the clamp to press ring until you feel it is properly tight.
(Do not cut off the extra wire at this moment.)
(3). Check again that there is no twists, cross over, coils
and knots for the wire. The wire should be totally inside the track
but not twist with the carriers and the wheel of the carriers.
(4). There should have a smooth feeling when move the carriers
"A" along the track for final check. |
| |
| 3.4 Wall/Ceiling bracket Installation |
The system is
designed to install either on the wall, figure 6 or ceiling,
figure 7. Different materials require different material
and method to fasten the product on the wall or ceiling.
The package comes with wall plugs and screws . Usually,
two brackets are good for one one-meter long track. It
is recommend that one of the brackets should near the
transmission box and one should be near the other end
of the track.
Note: All the bases and brackets should be on the same
surface and straight line and leave at least 50mm spaces
between the wall and the track.The transmission box can be assembled on either the right or left
side. |
 |
 |
 |
 |
| figure 6 On the wall |
figure 7 Under the
ceiling
|
figure 8 Transmission
box
|
figure 9 Infarrd light
receiver
|
|
| |
3.5 Transmission Box Installation
(1) Insert the transmission box into the carrier base until
you heard the sound 'CLICK'. The red button will lock the transmission
box automatically. Check if the box was installed properly
(2) Pull the red pad and then draw out the transmission box
as figure8.
(3)Insert the infar red light receiver into the port. The infar
red light receiver should face the room, as show in figure 9.
(4) Connect the adaptor to the supply of electricity and the
transmission box.
(5) Hand up the curtain properly.
3.6 Adjust the tension of the wire
(1) Using the control pad (figure 11) to operate the system,
the curtain will move smoothly even the carriers passing the
connection point of the track.You have to adjust the tension of
the wire if the curtain can not stop automatically when it is fully opened/closed.
(2) Use the wrench to turn the hexagon bolt clockwise until the curtain can stop
automatically within 2 seconds when it is fully opened/closed.
the hexagon bolt is located at the end of the main track.
If the motor cannot stop in 2 seconds when the curtain is fully opened/closed even the hexagon
bolt has been adjusted to the top end position.
You have to release the hexagon bolt anti-clockwise to the lowest position,
do not loose out the bolt from the base track,
then loosen the big head screw on carrier "A" on half way as shown in figure 1,
and pull the wire until it is taut and fasten the screw on carrier "A" again.
Repeat procedure "3.3 (2)"until the curtain stop automatically within 2 seconds when it is
fully opened/closed.
(3) Fasten all the screws and cut off the extra wire.
3.7 Track assembly for One Way Applications
(1) Undone the wire and remove the twists from the wire. Also uncoils the wire carefully.
(2) Loosen the big screw on carrier "A" to the half way as shown in figure 1.
(3) Loosen the small screw on the carrier "B" to falf way as shown in figure 2.
(4) Loosen the fasten screw at the end base, with the pulley
system, then take the end base out of the track carefully in
the direction along the track. The wire will go along with the
end base.( The plastic pulley does not remain in the track except
the side of Bigger Carrier "A".)
Make sure not to twist and coil the wire. See figure
3 and figure 4. Since the wire is enough length to go along
with the end base.
(5) Pull the small carrier "B" out of the track,
unscrew the nut that is located at the bottom of the carrier"B" and loosen the screw
on the top of the carrier "B".
(6) With pliers, grab out the wire gently,
and then you can take out the smaller carrier "B" from the wire.
Take out the entire plastic pulley simultaneously.
(7) If you wanted to add the pulley on the side of Bigger
carrier "A", pull out the Bigger carrier "A"
from the track very careful, Then insert the pulley into the
track one by one according to your requirement.(recommend one
pulley for every 12cm.)
Make sure not to twist and coil the wire. See figure
3 and figure 4. Since there is enough length for the wire will
go along with the end base.
(8)Place back the Bigger carrier "A" into the
track carefully, push the end base into the end of the added
track and fasten the screw on the end.
(9) Pull the wire until it is taut and fasten the screw in
bigger carrier "A".
(10) Adjuest the tension of wire (procedure 3.3) until the curtain stop
automatiaclly within 2 seconds when it is fully opened/closed.
|
| |
3.8 Switch Control Setting
Warning: The infar red light receiver is specific designed only
for this remote control window treatment system . The receiver
cannot be used or modified for other uses. The receiver needs
two batteries to operate.
Curtain No.1 can be set by switch the switch control 1 to ON
and all others set to OFF. Other curtain
number setting is similiar with different numbers of ON
and OFF. By default, the switch
is set to 8 when delivery. Figure 10 shows the switch control. |
| |
3.9 Remote Control Operataion
After the switch control is set, the corresponding curtain can
be opterated by using the information from table 1 with remote
control. Figure 12 shows the remote control. |
 |
| |
3.10 Reset Switch Control
The power for the corresponding switch control should be TURN
OFF for 10 seconds when it is necessary to change the curtain
no. |
 |
 |
 |
| figure 10 Switch Control |
figure 12 Remote control |
figure 11 System Control Pad |
|
| |
3.11 Methods to Control the System
The window curtain treatment syetem can be controlled by remote
control, manually and control pad attached to the system.
NOTE: Only ONE of the following method can be used at any time
and do not pull the curtain force othetrwise the curtain will
fall off the pulleys.
3.11.1 Remote Control
The procedure to operate (open/close) curtain No.1;
(1). Press button No.1 on the rremote control;
(2). Press
for open/close;
(3). Press STOP to stop the operation.
The operation is similiar for other curtain numbers. If the
STOP key does not press, then the curtain
will continue to open(close) until it is fully opened(closed).
The system will stop automatically when it is fully opened(closed).
Warning: The system is designed only for eight systems per room.
The systems with the same number of setting will be operated
at the same time.
3.11.2 Manual Control
The system is also designed to draw by hand for open and close.
3.11.3 System Control
There is a control pad attached to the transmission box.
The operation procedurers are follow, The system control pad
is shown in Figure 11.
|
| |
| |
|
|
Note: This remote
control power curtain system is for indoor use only.
This remote control power curtain system is designed
for office and home use. This product includes transmission
box, remote control, adaptor, manual control, tracks, track
connectors and wall/ceiling brackets. |